multikolour(m): 8:29pm On Sep 06, 2020 |
n3xt:okay I will and revert |
n3xt(m): 8:29pm On Sep 06, 2020 |
Muyi002(m): 8:33pm On Sep 06, 2020 |
Muyi002: For the cement and sands, I took my time to calculate this: Room Dimensions Internal Plastering = 70 bags Mixing ratio = 1:6 1 bag of cement and 12 head pans 1.Internal Lobby 10.7 ➕ 2.2 ✖ 2 = 25.8 = 7 bags =14 dust & 70 plaster 2.Other toilet(2) = 2 ➕ 1.7 ✖ 4 = 14.8 = 4 bags = 8 dust & 40 plaster 3.Room lobby = 3.6 ➕ 1.2 = 4.9 = 2 bags = 4 dust & 20 plaster 4.External lobbies (2) = 1.2 ➕ 3.0 ✖ 2 = 8.4 = 3 bags = 6 dust & 30 plaster 5.V/T = 6 ➕ 1= 7 = 2 bags = 4 dust & 20 plaster 6.Ante 6 ➕ 4 = 10 = 3 bags = 6 dust & 30 plaster 7. Parlor 5.0 ➕ 5.4 ✖ 2 = 20.8 = 6 bags = 12 dust & 60 plaster 8.Dining 3 ➕ 3.5 ✖ 2 =13 = 4 bags = 8 dust & 40 plaster 9.Kitchen 3 ➕ 4 ✖ 2 =14 = 4 bags = 8 dust & 40 plaster 10.V-Room 3.8 ➕ 3.5 ✖ 2 =14.6 = 4 bags = 8 dust & 40 plaster 11. Other room(2) 3.4 ➕ 3.6 ✖ 4 = 28 = 8 bags = 16 dust & 80 plaster 12. GT 1.2x2.4 closet 1.2x1.2≠5 = 1.2 ➕ 3.6 ✖ 2 = 9.6 = 3 bags = 6 dust & 30 plaster 13.Master closet = 1.8 ➕ 2.1= 4 = 1 bag = 2 dust & 10 plaster 14.Master room = 3.9 ➕ 5.8 ✖ 2 = 20 = 6 bags = 12 dust & 60 plaster 15.Master toilet = 3 ➕ 2.1 ✖ 2 =10.2 = 3 bags = 6 dust & 30 plaster 16.Laundry = 8 ➕ 1.6= 9.6 = 3 bags = 6 dust & 30 plaster 17.Store = 8 ➕ 1.5= 9.5 = 3 bags = 6 dust & 30 plaster 18. Main veranda = 3 = 1 bag = 2 dust & 10 plaster External Plastering = 35 bags Mixing ratio = 1:4 Back of building = 11.6 = 7 bags = 14 dust & 42 plaster Kitchen side = 19.6 = 10 bags = 20 dust & 60 plaster Master room side = 22.2 = 11 bags = 22 dust & 66 plaster Front of building = 5.5 = 3 bags = 6 dust & 18 plaster 8 Likes 2 Shares |
Muyi002(m): 8:39pm On Sep 06, 2020 |
multikolour: Please note that this price is Ilorin based. I don't know how they charge in your own location. Please factor that into your calculations. |
multikolour(m): 8:45pm On Sep 06, 2020 |
Muyi002:noted sir, I will do that |
rotecch77(m): 9:04pm On Sep 06, 2020 |
multikolour: Noting difficult there so far they are mixing it with plaster sand. Actually if it’s to be used only (not commonly used this way) then the rate will be more a little just because it’s dry quickly, if 1st apply on the wall btw 30min it will dry up so it will be difficult to Smooth btw that time (30-40min) But here you are mixing it with plaster sand so nothing difficult there. |
multikolour(m): 9:22pm On Sep 06, 2020 |
rotecch77:we are actually using sharp sand only and no mixing with mud as we don't have pure plaster sand. Even as such the estimate is high and I need to renegotiate with them or sack them and bring a new team 2 Likes |
Mayor78: 9:38pm On Sep 06, 2020 |
n3xt: Bearing in mind that those customers include me, you can see why it is not difficult for the owner to insist on leaving the design as it is, knowing that as an abstract design, it would appeal to very many people. Mere looking at it, one can tell they are not there as a load bearing structure rather a default piece of art. I share the owners thought. |
Enyinne(f): 10:21pm On Sep 06, 2020 |
U sent this but when ur later called for it , did u supply it , after several calls put to u , u came up with 225k as ur best price . So why didnt u supply the 175k u mentioned since its bargain price and i suddenly left it to buy granite for 180k .i thought any homeowner will jump into the best offer .What happened to yours ??Ur only using that to lure customers then tell them the home truth about ur price .its u that will diy young as what ever u wish for others is definitely ur portion. Efulefu di ka gi , agbero tipper garage
Chekitaut: 5 Likes |
Abolarin91(m): 10:44pm On Sep 06, 2020 |
Oh OK! Thanks for your response sir.
mufutau55: 1 Like |
Abolarin91(m): 10:46pm On Sep 06, 2020 |
Noted sir. Thank you
twinskenny: |
Abolarin91(m): 10:47pm On Sep 06, 2020 |
OK, thanks for your input.
Dennis3D: |
Enyinne(f): 10:56pm On Sep 06, 2020 |
Chekitaut: 3 Likes |
Enyinne(f): 11:01pm On Sep 06, 2020 |
U thi.eve quoted 10tons of sand for 45k . And granite 225k . U wont make heaven oo. U are out to reap people off . Caveat is on him , shine ur eyes well or else ur money is lost with him
Chekitaut: 5 Likes |
henrymor: 11:05pm On Sep 06, 2020 |
Hi my people, Please, how much will a carpenter charge for Gerard roof woodwork? Thanks |
Abolarin91(m): 11:23pm On Sep 06, 2020 |
I think this is cheaper compare to concrete slab (reduction of reinforcement). It is called honey-comb floor. I stand to be corrected...
twinskenny: |
n3xt(m): 11:24pm On Sep 06, 2020 |
n3xt: 420sqm Dogbone Interlocking Project Today, I ordered 2 x 30 tons Truck of Stone Dust. I was offered N70k which is fine by me. Should anyone know where I can get a better deal, please kindly dm me, I still need more. I’m also making arrangements to ship in 2500 pcs of 8cm interlocking mold and some quantities of flower kerbs mold to Ibadan tomorrow. We’re looking at completing the production within 8 working days barring unforeseen challenges. #brabusinterlockDIY 2 Likes |
flekky07(f): 1:22am On Sep 07, 2020 |
n3xt:Brabus nice one more grace, pls where is location of site? Following in 3D 2 Likes |
Johntemmy(m): 3:42am On Sep 07, 2020 |
henrymor: location and what's the size of the building?. I can handle the woodwork with my team with professional job..both supplying and installing. check my signature for more details |
n3xt(m): 4:42am On Sep 07, 2020 |
flekky07: This project is in Ibadan. |
megacontrol(m): 6:02am On Sep 07, 2020 |
*post deleted*..found info in previous response poseidonsaiz: 1 Like |
amalab30(m): 6:40am On Sep 07, 2020 |
Man of his words. Kudos! n3xt: |
Dennis3D(m): 6:54am On Sep 07, 2020 |
Focusmind: It is. That's why the client opted for another option. Coz to do the kitchen alone would have costed over 500K for just tiles only... By the square meter required |
Dennis3D(m): 6:55am On Sep 07, 2020 |
Focusmind: It is. That's why the client opted for another option. Coz to do the kitchen alone would have costed over 500K for just tiles only... By the square meter required... |
Dennis3D(m): 7:03am On Sep 07, 2020 |
DFAMEGUY11S: Message me on Whatsapp 07038166370 |
michlins(m): 7:07am On Sep 07, 2020 |
valencia2012:if you're in need of iron works such as burglaries, doors, handrails and standing tanks. Kindly me
|
n3xt(m): 7:50am On Sep 07, 2020 |
Dennis3D: Which makes me to ask “Must we tile all the kitchen or just the wet areas?” If yes, why? I didn’t do that in my personal build and Buhari has not arrested me and I’ve never had to complain ing very expensive tiles. I have the dry and wet areas in the kitchen. Pic 1 & 2 shows the wet and the dry area. 1 Like |
henrymor: 8:30am On Sep 07, 2020 |
Thank you for the swift response. The location is oyo and it is a 3 bedroom bungalow... Around 280 Square meter. How much will the wood work for Gerad cost? Johntemmy: |
poseidonsaiz(m): 9:05am On Sep 07, 2020 |
megacontrol: Alright |
poseidonsaiz(m): 9:07am On Sep 07, 2020 |
Meanwhile, if you have any ion for peanut making, sales and distribution, here is something you may like to ease production.
|
n3xt(m): 9:37am On Sep 07, 2020 |
poseidonsaiz: Do/can you make vibrating table? I need something with 3hp vibrator motor. 1 Like |
poseidonsaiz(m): 9:43am On Sep 07, 2020 |
n3xt: Yes we can. You could write/WhatsApp us on 07011561993 for more info. |