General Topic Thread-To Discuss Anything And Everything in Building Construction (5380109 Views)
Biztech05(m): 10:40pm On Feb 29, 2020 |
Did you need an Engineer/ Builder (site supervisor) Try Biztech consult we are always here to serve you better! Email: [email protected] WhatsApp or call :+2347066483964. |
earthrealm(m): 10:44pm On Feb 29, 2020 |
mufutau55: lol, pop corn ceiling, its way better than the pvc shi,t flying around, and looks quite nice for a budget build, its cos the pic i posted is of a damaged one, guess thats why you think its not good |
GoodFaith: 12:12am On Mar 01, 2020 |
mufutau55: 95% of all ceiling in US are drywall |
mufutau55(m): 1:42am On Mar 01, 2020 |
earthrealm: Pop-corn ceilings, not good? I like the design it's just that some used in early 70s were detected to have asbestos, that is why they were condemned in USA present time. There are some of them without asbestos still lingering around in old homes now, especially some concrete ceilings. Hajji M. |
mufutau55(m): 2:01am On Mar 01, 2020 |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 6:18am On Mar 01, 2020 |
Good morning house. Pls how much is sweethome WC (mini set)? |
Geophilip: 9:14am On Mar 01, 2020 |
DontBeStupid:budget 50 - 60k |
Muyi002(m): 10:18am On Mar 01, 2020 |
This what I have spent to this stage. Labour Cost for Foundation Excavation, Blinding and Block setting to Lintel = 180000 Blinding Cement - 30 bags @ 2500 = 75,000 Sharp Sand - 20 tonnes = 32,000 Granite - 25 tonnes = 105,000 Total = 212,000 Foundation Block Setting & Sock away Pit Blocks = 1400 @ 150 = 210,000 Cement - 30 bags @ 2400 = 72,000 Sharp Sand =15 tonnes = 24,000 Labour for Soak away = 62,000 Extra Labour Expenses = 20,000 Total = 388,000 Foundation Filling Labour = 92,000 Laterite = 326,000 Total = 418000 DPC - Half DPM Nylon = 11,500 Granite= 10 tonnes = 45,000 Tara = 10 tonnes =13,000 Sharp sand = 10 tonnes = 15,500 Planks - 25 pieces & nails = 25000 Iron 16mm - 4 lengths @4400 = 17600 8mm - 3 lengths @ 1250 = 3750 Binding wire =2500 Transport = 2500 Workmanship Labourer = 40000 Welder and carpenter = 13000 Cement = 28 bags @ 2500= 70000 Wire Mesh = 10500 Total = 273,000 Above Foundation Block setting + 2 soak away pits Blocks 4100 @ 150 = 615000 Water = 3000 Sharp sand = 36000 ing sand = 18000 Cement @2500 =162500 labour = 56000 Total = 891000 Lintel and Pillars Casting 16mm - 8 lengths @ 3630 = 29040 8mm - 31 lengths @ 1030 = 31930 12mm - 34 lengths @ 2050 = 69700 1 binding wire = 4000 Transport & logistics = 4000 Wood and planks ➕ TP = 51000 Granite = Used remains Sharp sand = 15000 Cement = 30 bags @ 2500 = 75000 Workmanship Labour 40000 Carpenter 22000 Iron bender 17000 Total =360000 Parapet and soak away Casting Iron plus 12mm - 30 lengths @ 1970 = 59100 8mm - 51 lengths @ 1420 = 72420 Big Binding wire @ 7000 Extra iron = 9000 Quarter rod - 15 lengths @ 200 = 3000 Transport = 3500 Workmanship = 25000 Wood and cutting = 175000 Nail = 11100 Transport = 4000 Workmanship = 40000 Granite = 20 tonnes = 100000 Sharp sand = 15 tonnes = 21000 Cement 50 bags @ = 130000 Labour = 50000 Total = 710,000 Electrical 20mm pipe = 2 bundles @2100 25mm pipe = 1 bundle @ 3200 Electrical materials = 14000 Workmanship =9000 Plumbing Internal plumbing Cost of pipes and accessories = 47,000 Labour = 18,000 7 Likes 1 Share |
Alams85: 12:14pm On Mar 01, 2020 |
Muyi002:weldone, how many bedroom flat is diz? 1 Like |
Tiztonio(m): 1:46pm On Mar 01, 2020 |
Original J&B wires and cables with pure copper and complete 100metres in length available 1mm- N3,700 1.5mm- N4,900 2.5mm- N7,900 4mm- N13,000 6mm- N20,000 10mm- N31,000 16mm- N47,000 us on : 08083108100 We are Located in Benin city, Edo state Quality Gold and silver sockets and switches 13amps socket (Gold and silver)- N700 for 1 piece 15amps socket (Gold and silver)- N800 for 1 piece 13amps double (Gold and silver)- N1100 for 1 piece 1 Gang switch (Gold and silver)- N 500 for 1 piece 2 Gang switch (Gold and silver)- N 600 for 1 piece 3 Gang switch (Gold and silver)- N 700 for 1 piece Water heater switch (Gold & silver)- N700 for 1 piece TV socket (Gold and silver)- N600 for 1 piece Note that the prices listed here is just for a piece. You can buy as many pieces as possible and know the prices through our daily mathematics grin Also note that the Skyrun fancy sockets are made of copper terminals which will stand the test of time. It's not just fancy but quality as well. Same quality goes for my copper wires and cables which I have marketed here as well 3 Likes |
Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Nobody: 2:16pm On Mar 01, 2020 |
Health emergency volunteers wanted! Location: Nationwide Wage: 10,000 per day Required Qualifications/Skills: * Physical fitness * HND / B.Sc in any discipline * Must have fair verbal and written communication and interpersonal skills. * Excellent and positive attitude * Ability to multitask Click the link below to apply https://sites.google.com/view/volunteertoday/home 1 Like |
Dominionng(m): 2:27pm On Mar 01, 2020 |
earthrealm: Flat plasterboard ceiling with textured paint. This shouldn't be a problem. |
Dominionng(m): 2:30pm On Mar 01, 2020 |
saydfact: 12ft x 12ft is 16sqm |
Dominionng(m): 2:35pm On Mar 01, 2020 |
Boyhood: Your best bet is cement board 1 Like |
IFEBARBIE: 2:44pm On Mar 01, 2020 |
Hargbo: Howdy bro... Hope not too late. You can call baba Ibeji on . You'll be glad you did, cheers! 1 Like |
Dominionng(m): 2:47pm On Mar 01, 2020 |
mufutau55: Thanks for the mention sir. It's definitely popcorn ceiling: flat drywall with textured paint. How to achieve this: Plasterboard/drywall is drilled to the wood, ts are treated, skimming(aka screeding), then textured/pattern paint is applied. |
IFEBARBIE: 2:58pm On Mar 01, 2020 |
Howzit guys, I want to appreciate all that contributed and those that learnt one or two things on the tile matter I brought to the floor. Eventually, I was able to secure a 300# /sqm. Thanks
|
mufutau55(m): 3:30pm On Mar 01, 2020 |
Dominionng: Thank you Sir. I am glad I do know what I was talking about. Hajji M. |
Muyi002(m): 3:38pm On Mar 01, 2020 |
Alams85: 4 bed room |
Hargbo(m): 5:24pm On Mar 01, 2020 |
IFEBARBIE:nope it's not too late, is he based in Abeokuta |
EndiaSami: 6:59pm On Mar 01, 2020 |
DontBeStupid:40000 |
EgunMogaji2: 7:27pm On Mar 01, 2020 |
Regarding “popcorn ceiling”, for what it’s worth it’s really old school design from the 60’s. People renovating older homes pay money to have it scraped off and there’s a right little cottage industry in the USA doing that. |
earthrealm(m): 7:52pm On Mar 01, 2020 |
Dominionng:ok, was thinking along those lines as well. so the design on the paint, is reproduced accurately/uniformly, am guessing the design is embedded in the paint roller, they are using? @egunmogaji, ooh its that old ![]() i still think its better than pvc and the like for budget builds |
Odbas(m): 7:55pm On Mar 01, 2020 |
EXCEL GEOTECHNICS CONSULT. Specialized on Geophysical Exploration such Geophysical Investigation /Survey(VES, T, PQWT and Water Detector), Bore Hole Drilling, Installation of submersible pump, surface pump and maintenance e. t. c We are expert, professional and good relation with customers and ® Company with CAC and collaborate with SOUTHWEST DRILLING. 08114178911 or Whatsapp for enquires . You can also our whatsapp group to know all what Geophysical Exploration entails . https:///BeALWmqrFPwEenIGJQuk5E |
soonest(f): 8:33pm On Mar 01, 2020 |
Muyi002:You are really doing well and making progress Thanks for sharing. It really helps us to compare prices. |
ak22(m): 9:28pm On Mar 01, 2020 |
Dominionng: Sorry sir your calculation is not correct. How can 12/12 be 16sqm² 12by12 is 3.6*3.6 = 12.96. 3.7*3.7= 13.69 with skirting |
rotecch77(m): 9:44pm On Mar 01, 2020 |
ak22:[quote author=ak22 post=87090724] Issue over flogged ...anyways Dominium is right bcs he add scatting and little waste to the total calculation that is why he got 16m. You also you are right in the sense that you calculated the actual area, but in construction .QS calculation you need to add scatting and waste 1 Like 1 Share |
Dennis3D(m): 10:28pm On Mar 01, 2020 |
Thanks to our clients, followers and fellow colleagues. All the best to the New Month.
|
Tiztonio(m): 10:39pm On Mar 01, 2020 |
Tiztonio:Patronize me and you will be glad you did. Our office is at 58, Akpakpava Road |
bizzibodi(m): 8:01am On Mar 02, 2020 |
Pls I want to build a bungalow with a 2 rooms in d roof (what is it call)14 by 12ft with 2nos 4 by 4ft toilet,do I cast d floor for d rooms only or d entire floor?
1 Like |
Biztech05(m): 8:45am On Mar 02, 2020 |
Are you think of who to call for project? Try BIZTECH CONSULT we are always here to serve better! Don't just build! Engaged professional WhatsApp or call+2347066483964 Email;[email protected] Happy New month Nairalanders |