NewStats: 3,261,643 , 8,174,640 topics. Date: Thursday, 29 May 2025 at 10:36 PM 1c4q2v6z3e3g |
General Topic Thread-To Discuss Anything And Everything in Building Construction (5365788 Views)
gbadexy(m): 5:59pm On Apr 16 |
gabbytabby:07082715846. |
gabbytabby: 6:07pm On Apr 16 |
Na so I see am. I would usually buy half of materials to start. The last job he did for me I decided what I was going to buy material wise and gave the person who introduced him to me to buy na real area father and we are storing materials with him. Sometimes you gat to let somethings go. It came it at 495k materials and Labour, supervision and area boys self. They donβt know that is not usual with me. Here I have storage space so will just get maintenance supervisor to source materials and call them that I am ready to paint. rotecch77:
|
AngelicBeing: 7:03pm On Apr 16 |
gabbytabby:Oh l see, 12 Flat, due to the hyperinflation currently in Nigeria, everything has skyrocketed ooo ![]() |
rotecch77(m): 7:37pm On Apr 16 |
gabbytabby:Materials 950k Labour 750k That is reap off, |
bolu1986(m): 11:20pm On Apr 16 |
For your Pop Wall screeding Plaster board installations Letβs talk 07088534661 Note: real work picture attached 2 Likes 1 Share |
gbadexy(m): 7:25am On Apr 17 |
In one project I supplied recently, the caretaker brought a painter to give a quote using 5; different paint companies according to the owner. His workmanship was very low but he added between 10 to 12k on the market price of the paints. I told the client there is no way this painter would agree to this workmanship and agree to use another product gotten elsewhere. I sent two different painters to compare quotes and one of them did it. I couldn't care less who does the job so far he is competent to bring out the paint well but the point I want to make is that the workmanship and product price may be adjusted to give a favorable impression about charges. The price of the paints above is quite low in the market except perhaps he intended to somewhat produce it himself and make the profits on the application. Even the budget grade is around 18k to 18500 in the market and I am not disputing he could provide it cheaper, but it would still mean budget grade emulsion is used for the external and the durability is not as that of the higher grades. The additional cost of repainting during the period the higher grades would last outdoor would make it higher on the long run. There is a reason paints like eagle and president is more than twice the price of the likes of fine coat, prestige and the rest budget grade paints. 3 Likes 1 Share |
floshady02: 9:08am On Apr 17 |
SCAMMER ALERT π¨ NAME: MICHEAL ADEDAMOLA AROROJOJOYE. NAIRALAND PROFILE: @professionalmas / jiji profile DAMOLA MICHEAL. YOUTUBE: LUCKYRAMSEY. HE POSTS OTHER PEOPLES JOBS ON YOUTUBE, JIJI AND NAIRALAND. JIJI PROFILE: DAMOLA MICHEAL EVEN THOUGH JIJI HAS BLOCKED HIS PROFILE AFTER FINDING OUT HE IS A THIEF. HE USES OPAY AC NO 9114909601. NAME ADEDAMOLA MICHEAL AROJOJOYE. HIS TELEPHONE NUMBER IS 09164483306 BEWARE HE WILL COLLECT YOUR MONEY AND RUN. HE IS A PROFESSIONAL SCAMMER/ THIEF. HIS PICTURES ARE ALL OVER THE INTERNET TAGGED A THIEF. FOR THOSE IN DIASPORA ESPECIALLY BE CAREFUL NOTE THIS FACE. DONT FALL VICTIM. HIS PICTURE IS ALL OVER GOOGLE AS A THIEF THAT HE IS. BIGGEST SCAMMER OF THE CENTURY. BEWARE...Pls SHARE SHARE SHARE.. so others donβt fall victim
1 Like |
twinskenny(m): 9:10am On Apr 17 |
https://x.com/thebeninblogger/status/1912597263093821696?s=46 There is someone who can do it cheaper! The result is always there 1 Like |
Balistic4: 10:12am On Apr 17 |
good day guys. Please, between lorenzi and interdab, which is a better submersible pumping machine? I made a mistake the other day and interchanged the electrical part of my submersible that is going to the gen and the part going to the submersible. Now the machine won't pump again, I fear it has damaged both the submersible machine and the power box, though when I interchanged it back, the light on the power box shows up but won't pump water. Please, between lorenzi and interdab, which is better? I felt that if a better pumping machine was used, there would be a safety circuit somewhere that would prevent any damage |
Billions123: 10:24am On Apr 17 |
twinskenny:I don't think this is about doing it cheaper. 2 Likes |
OkanlawonB(m): 10:41am On Apr 17 |
twinskenny: This is a result of thunderstorm which is an "Act of God" , has nothing to do with pricing or poor quality job. High pricing does not even always guarantee you quality. 6 Likes |
hamtabfawaz(m): 11:50am On Apr 17 |
We not only design spaces.... we Transform it Reach out : 091222348437
|
gbadexy(m): 11:54am On Apr 17 |
While we are at this discussion, I will add an experience I had at store of calcium carbonate filler. I saw one of the workers filling the calcium carbonate with water in new paint buckets and asked him out of curiosity what it was for and he said that was what the customer told him to do. One matured person called it a term I can't recollect now and he said he uses ordinary water to complete the paints but this is a better idea he would use because those mad people don't like to pay. I'm aware painters fill empty paint buckets with water together with real paints. Any used paint bucket of any brand could be gotten by them. If you get the workmanship low, they would still find a way to make it up and often at the expense of quality or just at the client's expense in ways they don't know. This isn't about paint but everything in life in general. We all know we work hard to get our monies. Even contractors here are someone else's client and it's not easy making money but pricing shouldn't be much lower than what we know ourselves is below standard and be happy we made good bargain. We live and let others live too within reasonable limit. Lower prices definitely doesn't assure quality. Higher price with low quality simply means it should have been gotten lower and the person was cheated. 5 Likes |
darc: 2:09pm On Apr 17 |
Hello Gentlemen and Ladies We would be pleased to assist you with: 1. Architectural Design Services 2. Construction Drawings 3. Building Construction, Renovation and Maintenance Please us at: π§ [email protected]
|
EgunMogaji2: 2:34pm On Apr 17 |
Beframia: White and grey water lines are ran together. They really need to be ran separately into different pits. |
EgunMogaji2: 2:36pm On Apr 17 |
Greetings and salutation everyone. Hope yah all doing good. Peace and love. 6 Likes |
chuksjuve(m): 3:07pm On Apr 17 |
I want to ask this funny but troubling question π Is there a law now that people should no longer plant flowers or trees on their properties anymore ? Because it seems everybody is building houses, installing POP and other fancy decorations on their building project but in the end; itβs all concrete with no space for lawns, flowers or even shrub .. Whatβs going on πππ . 1 Like |
chuksjuve(m): 3:09pm On Apr 17 |
I have spent time going through all the discussions on here, seeing building but thereβs little or no spaces for small flowers, nor even indoor plants. Kilon sele gan gan .. Are you people not budgeting money for landscaping? πππππ |
gbadexy(m): 3:15pm On Apr 17 |
EgunMogaji2:Greetings sir. A friend of yours in ikorodu mentioned you. They're painting his house presently. You are appreciated sir. 1 Like |
EgunMogaji2: 4:17pm On Apr 17 |
gbadexy: Most excellent. I hope all the old timers are still around and kicking. 2 Likes |
odimbannamdi(m): 4:31pm On Apr 17 |
odimbannamdi(m): 4:37pm On Apr 17 |
twinskenny: Could this be the reason? |
odimbannamdi(m): 4:40pm On Apr 17 |
diordaves: Good learning here |
biosamak: 4:43pm On Apr 17 |
Hello people pls I need prices of this in Ibadan pls 8mm 12mm 16mm Your response would be much appreciated. |
gbadexy(m): 5:39pm On Apr 17 |
EgunMogaji2:Yes sir. Many are not active here anymore since they have finished their builds but I still get their referrals and recommendations. 1 Like |
edmasta01: 5:48pm On Apr 17 |
Please does anyone know what is next after POP ceiling, Plastering, window art work, sliding window, and external door has been completed. What should be next in the building phase to do? My engineer suggest tiling should start, but want to check if anyone has any further ideas? Also, a second question - I am looking to run inverter to give me opportunity to be offgrid if i choose to, will the wiring be different from the main house wiring or the electrician can leverage the same? any advice will be appreciated. Thank you. |
diordaves(m): 7:53pm On Apr 17 |
chuksjuve: Landscaping ke? Dem dey fear snake. 1 Like |
erico2k2(m): 8:00pm On Apr 17 |
EgunMogaji2:Long time no chat brosss 1 Like |
erico2k2(m): 8:01pm On Apr 17 |
EgunMogaji2:We dey kampe 1 Like 1 Share |
gabbytabby: 8:11pm On Apr 17 |
Nobi only snake person get tired of looking for gardeners after a while. diordaves: |
Philipok: 10:01pm On Apr 17 |
us for neat artwork design, pop and screeding work,08165523784.
|
rotecch77(m): 10:51pm On Apr 17 |
Beframia:Am just seeing this now. The problem is from either 1,. No adequate vent in all the toilets and the septic tank 2. Soil pipe and waste pipe link together 3. Chambers not well separated 4. Check for any possible leakages around your soil pipe If all these are ok then you need to consult your village people lolz |