NewStats: 3,261,357 , 8,173,780 topics. Date: Thursday, 29 May 2025 at 12:00 AM 1372686z3e3g |
General Topic Thread-To Discuss Anything And Everything in Building Construction (5363970 Views)
EgunMogaji2: 10:00pm On Nov 01, 2021 |
babadots: Sorry, I just won't do it. We have a lousy maintenance culture. The week that I was going to go inside finally the elevator fell and killed I think 5 people. This year. 4 Likes |
KolaShangOne(m): 10:09pm On Nov 01, 2021 |
Emergency services in Nigeria do not exist.
1 Like |
BrickDevo: 10:16pm On Nov 01, 2021 |
KolaShangOne:The country is far gone and we know it, sujimoto comes to mind the guy self is a questionable character 1 Like |
kingreign(m): 10:21pm On Nov 01, 2021 |
EgunMogaji2: Real fact, I don't use elevators in Nigeria, e get why! 2 Likes |
twinskenny(m): 10:33pm On Nov 01, 2021 |
EgunMogaji2: Damn there are some news we don’t even hear about 2 Likes |
n3xt(m): 10:42pm On Nov 01, 2021 |
KolaShangOne: That’s why I’ll never step or sit inside any of the multifloor structures in and around Alaba. Most of them were built by masons. |
n3xt(m): 10:46pm On Nov 01, 2021 |
dongc: Like Lekki Gardens, nothing will come out bro. |
dongc(m): 11:57pm On Nov 01, 2021 |
n3xt: Well the information is slowly coming out....read below not just the headline https://gazettengr.com/owner-of-collapsed-ikoyi-building-got-approval-for-15-not-21-floors-lasbca/?utm_source=ReviveOldPost&utm_medium=social&utm_campaign=ReviveOldPost |
n3xt(m): 12:03am On Nov 02, 2021 |
dongc: We are used to all these theatrics bro. I did more than all these on Lekki Gardens Building Collapse on this same thread in 2016. Just like Lekki Gardens, the approval was not for the number of floors built. Were they sleeping when 6 new floors were added? Can 6 floors be added to 15 floors in 4 months? RIP to the dead. 1 Like |
n3xt(m): 12:20am On Nov 02, 2021 |
For the records, almost all Lagos buildings has been served contravention notice, sealed, marked for demolition and unsealed at a point in time. It doesn’t take the Alausa rogues long time to come up with a defense. Even the structural engineers shouldn’t be exonerated if truly we understand the role of professionals in construction. You don’t ask for cube test samples. You take samples during the concrete pour by yourself. Let’s digress a bit. What happen to stage certification before concrete pour? I once shared that I did a project here that we cannot pour concrete until the MEP consultant, Structural Engineers/Consultant and LSMTL guys had certified the job. So the consultant want to sit in his office and wait for concrete cubes to be sent to him. We hardly do our job with utmost integrity. I weep for this country everyday. ___________ I also saw something on Zurich Building Guarantee... Well, we are first Nigerians. We love appellations. We love good things but would rather do cheap stuffs. I don’t blame those who call us names. 1 Like |
Amastermovic(m): 12:45am On Nov 02, 2021 |
This kind of issues cannot be easily cleared out of the system, most building collapse occurs due to the client claiming they are the sole of the project especially developer's that have test built two or three structures you cannot easily confuse such people they are wrong.. Especially this kind of client Kudos to the structural Engineers for terminating his consulting services because most engr will want to have their foot print on such job to collect more jobs.. The client will b like those Engr na nonsense we are on the 21 floor, unfortunately he's not here to be sued or question he's likely to be a deadload as well. Nothing like bad materials, everything materials with grade but you will buy low 1 and be complaining.. If you want to watch champions league will u pay 2k to dstv .. From one of the interveiw , a worker said some people dey chisel column and doing some patch work bla bla. 1 Like |
n3xt(m): 12:47am On Nov 02, 2021 |
Last year, one of my friend single-handedly delivered a multi-million naira SPEB project for the FG. He was the contractor, supervisor, inspector and commissioner. The main contractor only visited the project twice (during the kick-off and commissioning). |
Amastermovic(m): 12:57am On Nov 02, 2021 |
n3xt: Most time's the client will be on the contractor neck to deliver the job , the structural Engineer is not available on site to sign the note book, the contractor call the client back and the client say you can go ahead , structural engineer reach site they gve him specially made cube of grade 50 self they prepared for him to crush on lab because he no go fail.. Seneriao 2 building sold out investors still coming in more money consult your structural guy he's saying what you don't want to hear consult another person they tell you why not, but the first designer ed you guys have optimised this building because of cost to the last straw because QS said its too expensive than budget more money no land.. As a project manager working on all this high-rise residential mix used apartment I understand during foundation 60% sold out already amounting to money able to buy some local government |
BrickDevo: 1:13am On Nov 02, 2021 |
Amastermovic:This is major problem in the building industry, that feeling of na me contract, whatever I want is what you will do, before you know they Don get issue carry matter come Nairaland for settlement. |
Nero2424: 2:02am On Nov 02, 2021 |
BrickDevo: Our problems here are small money small problem. These towers structural problems cant be fixed most of the time, you just have to bring it down and start all over again. 1 Like |
EgunMogaji2: 4:18am On Nov 02, 2021 |
twinskenny:
|
cuddling44(f): 5:33am On Nov 02, 2021 |
somehow: Morning sir... |
cuddling44(f): 5:46am On Nov 02, 2021 |
KolaShangOne: Good morning sir, plss can dis structure carry precast parapet and roofing with 0.55 gauge. Or i better do d cladding.... cos nine inches blocks was used round. |
dongc(m): 5:46am On Nov 02, 2021 |
n3xt: What is your argument now?? Blame game is well known behavior by authorities ..I dont know how long it takes to add 6 floors.they are currently itting that on air...Man been arrested and offcourse the end we may not know...he would be released soon like other rich men |
somehow: 5:52am On Nov 02, 2021 |
One of the numerous reasons I find it difficult buying a house from most of these developers. Profit focus is 99% their worry and will do everything in their power to see to that including cutting corners 1 Like 1 Share |
somehow: 5:53am On Nov 02, 2021 |
cuddling44: Morning ma |
somehow: 5:54am On Nov 02, 2021 |
BuildingProject: I actually need one for consultancy and not really to handle the interiors in full. |
somehow: 5:56am On Nov 02, 2021 |
hamtabfawaz: Ok. |
money121(m): 8:21am On Nov 02, 2021 |
Hope @officialEFCC recongnize your Business? You don't av any Doubt to Deal with imranRoofing Becos my Company Already ed with SCUML we are 100% Legit For your Quality Roofing Sheet and Rain gutter Collector #Whatsapp 08085310359
|
cuddling44(f): 8:28am On Nov 02, 2021 |
somehow: Am available for d finishing stages of ur building sir. Chandeliers, wall brackets. Parlour decorations. Landscaping. Windows blinds, curtains and duvet... number 09013490082 . Thanks sir |
n3xt(m): 9:50am On Nov 02, 2021 |
Media Wall by NextHome | Ongoing
|
n3xt(m): 10:24am On Nov 02, 2021 |
Media Wall installation
1 Like |
n3xt(m): 10:30am On Nov 02, 2021 |
Z-Port by NextHome #perspexacrylic
|
n3xt(m): 10:32am On Nov 02, 2021 |
If God has really blessed you, build His church ![]() #towercladding #modernroofing #contemporaryceiling #extremereno
|
n3xt(m): 10:39am On Nov 02, 2021 |
: Shógúnlè by NextHome | December 2021
|