NewStats: 3,261,901 , 8,175,495 topics. Date: Friday, 30 May 2025 at 11:16 PM 4w4j3x

6z3e3g

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (3848) - Nairaland 5v435a

General Topic Thread-To Discuss Anything And Everything in Building Construction (5368867 Views)

(4)

Go Down)

Valuepaints20(m): 9:19am On Mar 22
KIDfurniture:
This tiler chop this man o! Wow ! That tiler go spend like a fraudster after that job. He still wan collect 60+ for Wetin e suppose do. After receiving 500k + for a job




Not Tiler, I think it’s the engineer he deal with direct. It might be chicken change that will even get to the Tiler.

2 Likes

Ayohbk(m): 9:39am On Mar 22
darc:


Where’s the location

Alapere, Kosofe local government, Lagos
KIDfurniture(m): 9:58am On Mar 22
Mmmmm you maybe right ooo! Considering what he charged - 1800 per sqm is outrageous. People get mind o.











Valuepaints20:
Not Tiler, I think it’s the engineer he deal with direct. It might be chicken change that will even get to the Tiler.
KIDfurniture(m): 9:59am On Mar 22
You’re very right ! Engineers re heartless sha.





BIGGIE121:


nor be the tiller na the engineer ..why tiller go collect 1800persqm come still dey ask for money for skirting? That 1800 self don overdo am.
OkanlawonB(m): 10:08am On Mar 22
Ayohbk:
Hello all,

We decided to proceed with the renovation of the building in Lagos and I insisted on doing everything according to the books. So we've paid safety commission, town planning, omo onile money. These already costs over 3m already. According to the engineer only Labca approval is remaining. I told him I don't want backdoor approval. So he sent me this list, that's requested from Labca official. Which totals over 4.3m. I think This expenses are outrageous. Can someone please help if this is how things are done? cc diordaves acmebuilding billions123

From my personal experience with approval process in Lagos, it's a fair billing, the only thing i find exagerated is the LUPAR fee.
LUPAR is just a report that could be sourced from any approved "connected" source. You people may ask from another source within your local gov. area Like the LASPPPA(town planning ) office of the site location, it may be like 300k instead of the quoted 750k. Don't source from outside your LGA.

The quoted tax money is for the last three years, its fair enough, thats how people in need of approval have been paying it. I paid as much recently also.
BIGGIE121(m): 10:25am On Mar 22
topsy23:


Was in Abuja on Saturday too.. Mabushi area. We have a renovation work in that area.. Wike is really working in Abuja. Serious road construction is really going on there

Yes, wike is trying in that aspect, road construction in every corner of Abuja since he was appointed minister. Hope the renovation is going well? .. good luck on the project . We were in life camp and won't be returning until duty calls.

1 Like

BIGGIE121(m): 10:31am On Mar 22
Cold141114:


Over do?
Have you heard screeding to fully dried floor laying, whereby you screed the floor and lay maybe the following day? With gum and cement with combing trowel

Different types of Tiling dey.... You can never conclude a fixed price for tiling works.....

But that doesn't justify charging another money for skirting and tiling the soap space.
Ayohbk(m): 12:08pm On Mar 22
OkanlawonB:


From my personal experience with approval process in Lagos, it's a fair billing, the only thing i find exagerated is the LUPAR fee.
LUPAR is just a report that could be sourced from any approved "connected" source. You people may ask from another source within your local gov. area Like the LASPPPA(town planning ) office of the site location, it may be like 300k instead of the quoted 750k. Don't source from outside your LGA.

The quoted tax money is for the last three years, its fair enough, thats how people in need of approval have been paying it. I paid as much recently also.

Thanks for your . If This is how it is then I wonder why people complain of high rent cost in Lagos. When one is already spending almost 10m on permits and approvals only. No wonder people would rather go behind the door for approval. If not for sentimental reasons, I go don run.. Residential projects or building in general is not worth it in Lagos Abeg.

1 Like 1 Share

Afolarin18(f): 12:25pm On Mar 22
[good afternoon

I’m not really sure of how it works but you can check their website on how to get e permit which I think should be cheaper

A. GENERAL REQUIREMENTS FOR THE PROCESSING OF ELECTRONIC PLANNING PERMIT

The following documents and payment are required for the processing of e-Planning Permit:

Sun print copy of Survey Plan
Proof of Ownership- which includes any or more of the following:
Certified True Copy of Certificate of Occupancy / Land Certificate;
Governor's Consent on lease/assignment/land conveyance/ any other instrument recognized by law;
Certified True Copy of former Owner’s Title in case of Governor’s Consent (Root of Title);
Stamped Duty Receipt of Land Purchase;
All Evidence of Payment for Title Document Processing;
Evidence of payment of land use charge
Certificate of Incorporation of Company (where applicable).
Processing fees:
Part Payment Fee (Screening Fee): For document verification /screening, Applicant will pay a non-refundable fee of N10,000.00;
Payment of Balance of Processing Fee: Applicant will pay a specified amount before application can be processed further. The amount will be determined after a successful screening of application/documents and Part Payment Fee will be deducted;
Receipts of other statutory charges (Stage Certification Fee) will be attached accordingly.
Tax Papers: Evidence of payment of Company and Personal Taxes viz;
For Individuals, Current e-Tax Clearance Certificate
For Company and Corporate bodies;
Company Tax Clearance (CTC);
e - Tax Clearance Certificates for 2 (Two) Directors;
Evidence of P.A.Y.E. returns.
Clearance from other MDAs
Letters of Clearance from the following Government Agencies duly certified (Where applicable). These include:

Land Use and Allocation Directorate -All State lands and Government Schemes;
Land Services Department - For Governor's consent and Subsequent transaction on landed properties;
Ministry of Transportation -In case of Properties within the proposed Metro line corridor, traffic generating activities;
Ministry of Environment - Office of Drainage for Applications within drainage alignment, gorge, flood plains / water bodies, lagoon, shoreline, Environmental Impact Assessment Clearance e.t.c;
Lagos State Urban Renewal Authority- Applications which fall within Urban Renewal Scheme Areas;
Lagos State Surveyor General's Office -Applications that fall within acquisition, revocation and excision areas;
New Towns Development Authority- Letter of Confirmation of allocation and Capital Contribution.
For Planning and Architectural Standard for the Designs- Please refer to the following Document:
Lagos State Urban and Regional Planning and Development Law;
2019 Lagos State Physical Planning Permit Authority (LASPPPA) Regulations;
Model City Plans Approval Orders;
Operative Approval Orders on Approved Layout Plans.
Standard for the Designs DocumentPlease refer to the following Document:
Statutory Documents
Design Standards
Space Standards
As built Applications shall submit Non-Destructive Structural Integrity Test (NDT) and Letter of Structural Stability signed and sealed by a Structural Engineer ed with the Council of ed Engineers of Nigeria (COREN)
All developments above 3 floors shall be accompanied by 3-Dimentional Architectural Drawings
Billions123: 1:00pm On Mar 22
Valuepaints20:
Not Tiler, I think it’s the engineer he deal with direct. It might be chicken change that will even get to the Tiler.
Na why one 'engineer' here talk say make builder no ask for second opinion. Anything your engineer talk, he's correct, make you do am. grin

2 Likes

diordaves(m): 1:32pm On Mar 22
Ayohbk:
Hello all,

We decided to proceed with the renovation of the building in Lagos and I insisted on doing everything according to the books. So we've paid safety commission, town planning, omo onile money. These already costs over 3m already. According to the engineer only Labca approval is remaining. I told him I don't want backdoor approval. So he sent me this list, that's requested from Labca official. Which totals over 4.3m. I think This expenses are outrageous. Can someone please help if this is how things are done? cc diordaves acmebuilding billions123

Where are you located? In the diaspora? Are all the documents in your name? If yes, you can work out the income tax to far far less. If you are in Nigeria, are you paying tax? If yes, submit this evidence for a negotiated amount. If you are not paying tax, you need to work with them but not that amount on the list.

All you need to pay should be less than 2mil.
Ayohbk(m): 1:38pm On Mar 22
diordaves:


Where are you located? In the diaspora? Are all the documents in your name? If yes, you can work out the income tax to far far less. If you are in Nigeria, are you paying tax? If yes, submit this evidence for a negotiated amount. If you are not paying tax, you need to work with them but not that amount on the list.

All you need to pay should be less than 2mil.

Hi, Thanks for the reply. I am not in Nigeria. I'm in .I have tax declaration of the country I live. Can I use that? Yes, all the documents are in my Name.

Can you please suggest how much I should negotiate for? Thanks
Beframia: 1:45pm On Mar 22
@ Topsy23 and Twinskenny:
What size of recline cable would you recommend to connect a 4-Br residential building to the mains electricity?
topsy23(m): 3:10pm On Mar 22
Beframia:
@ Topsy23 and Twinskenny:
What size of recline cable would you recommend to connect a 4-Br residential building to the mains electricity?

How many AC and water heater do u have.


Also, are you using 3 phase meter or single phase meter
cash1115(m): 3:48pm On Mar 22
We are available for your project

Beframia: 4:07pm On Mar 22
3 ACs and 1 water heater.
Considering a single phase meter.


topsy23:


How many AC and water heater do u have.


Also, are you using 3 phase meter or single phase meter
topsy23(m): 4:26pm On Mar 22
Beframia:
3 ACs and 1 water heater.
Considering a single phase meter.



25mm reclin cable is okay.. Note reclin is an aluminium cable.
floshady02: 4:49pm On Mar 22
FACE OF A SCAMMER NAMED MICHEAL ADEDAMOLA AROROJOJOYE. NAIRALAND PROFILE: @professionalmas / jiji profile DAMOLA MICHEAL. YOUTUBE: LUCKYRAMSEY. HE POSTS OTHER PEOPLES JOBS ON YOUTUBE, JIJI AND NAIRALAND. JIJI PROFILE: DAMOLA MICHEAL EVEN THOUGH JIJI HAS BLOCKED HIS PROFILE AFTER FINDING OUT HE IS A THIEF. HE USES OPAY AC NO 9114909601. NAME ADEDAMOLA MICHEAL AROJOJOYE. HIS TELEPHONE NUMBER IS 09164483306 BEWARE HE WILL COLLECT YOUR MONEY AND RUN. HE IS A PROFESSIONAL THIEF. HIS PICTURES ARE ALL OVER THE INTERNET TAGGED A THIEF. FOR THOSE IN DIASPORA ESPECIALLY BE CAREFUL NOTE THIS FACE.

Beframia: 5:06pm On Mar 22
Thanks.

topsy23:


25mm reclin cable is okay.. Note reclin is an aluminium cable.
twinskenny(m): 6:21pm On Mar 22
Beframia:
@ Topsy23 and Twinskenny:
What size of recline cable would you recommend to connect a 4-Br residential building to the mains electricity?

25mm aluminum is okay but please make sure is the one with full guage
Ayohbk(m): 6:40pm On Mar 22
diordaves:


Where are you located? In the diaspora? Are all the documents in your name? If yes, you can work out the income tax to far far less. If you are in Nigeria, are you paying tax? If yes, submit this evidence for a negotiated amount. If you are not paying tax, you need to work with them but not that amount on the list.

All you need to pay should be less than 2mil.

Sorry, I didn't See the last sentence before. Do you mean the total amount to pay for everything on the list should be around 2m or you meant the tax?
Port443: 6:43pm On Mar 22
Good evening guys. Please what is a fair price for stamped concrete labor per square meters? I will be providing all the required materials, down to everything that needed to be rented, so this is purely for labor location is Abuja
topsy23(m): 7:58pm On Mar 22
twinskenny:


25mm aluminum is okay but please make sure is the one with full guage

Yes any of the Nigeria cables imported cables are not full gauge. Purechem, Coleman, Nigerchin.
rotecch77(m): 8:52pm On Mar 22
Did you know that cost of Labour covered about 28-35pec of the total cost of construction?

Anything above this is reap off

HealthCas: 2:32am On Mar 23
rotecch77:
Did you know that cost of Labour covered about 28-35pec of the total cost of construction?

Anything above this is reap off

Anything more than 20% is overbloated
rotecch77(m): 5:30am On Mar 23
Did you know that materials covered about 65-75pec of total cost of construction ?

This is for educational purposes only for who care to know

Watch out for more tips
Port443: 6:52am On Mar 23
Port443:
Good evening guys. Please what is a fair price for stamped concrete labor per square meters? I will be providing all the required materials, down to everything that needed to be rented, so this is purely for labor location is Abuja

Good morning guys, please I need here, the person I got from Jiji is quoting 3.5k per square meters and he is not proving anything, even down to what to rent

That is his quotation here. For the record, the total square meters is 230 and he said we will need to do 10cm thickness

VillageHustle: 8:49am On Mar 23
Good morning house, I hope you are all having a wonderful weekend.


Please what’s the current price range for architectural designs/drawings for a 3bed room bungalow. Thanks
cash1115(m): 8:59am On Mar 23
Available and affordable

HealthCas: 10:07am On Mar 23
rotecch77:
Did you know that materials covered about 65-75pec of total cost of construction ?

This is for educational purposes only for who care to know

Watch out for more tips
Materials shouldn't cost less than 80% of the cost of building.

Any workmanship that cost more than 20% is expensive

1 Like

kopell: 10:08am On Mar 23
Ayohbk:
Hello all,

We decided to proceed with the renovation of the building in Lagos and I insisted on doing everything according to the books. So we've paid safety commission, town planning, omo onile money. These already costs over 3m already. According to the engineer only Labca approval is remaining. I told him I don't want backdoor approval. So he sent me this list, that's requested from Labca official. Which totals over 4.3m. I think This expenses are outrageous. Can someone please help if this is how things are done? cc diordaves acmebuilding billions123
Please don't let them convince you to do anything back door deal, lagos state will come hard on you. Stability test is not a letter, it is a complete test report that will be submitted. I hope that your assessment fee is correct, because assessment is based on size of building and height , including security, generator, even dog house on the land will be measure. If you don't have them on the drawing, they will come for physical inspection, if anything different from your drawing, they will reassess you for additional fee. Tax bill to high, if you don't want to expose your income from abroad, they have standard average income tax of 1.5m they charge. If you're lucky to be handlining 2 projects at the same time, that amount cover those 2 projects as far they are in the same year. Good luck

1 Like

kopell: 10:21am On Mar 23
HealthCas:

Materials shouldn't cost less than 80% of the cost of building.

Any workmanship that cost more than 20% is expensive
Why should labor base on the cost of project? I don't understand this

Reply)

Viewing this topic: 8 guest(s)

(Go Up)

Sections: How To . 76
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or s on Nairaland.