Lordcrixus: 4:53pm On Jan 06
darc:


Location and size of building?

Location is Lagos and the size of the building is 6m by 10m.
Thanks
fashrola(m): 5:09pm On Jan 06
Ourown:
Can you please help me review this quotation for the German floor foundation? I wasn't expecting this to be more than 1.5m.

Abeg which granite you buy? Cos when I started my foundation work, I bought 30 tons for almost 1 million Naira last year….
darc: 6:01pm On Jan 06
Lordcrixus:


Location is Lagos and the size of the building is 6m by 10m.
Thanks

The Reinforcement 13.5 tons is it for the entire structure or just foundation?
Looks much for a 6 x 10m foundation
Are you sure the structure is 6 x 10,? I doubt that, cos 6 x 10 can't contain a duplex + 2 flats.

You can send your drawings to my mail for detailed BoQ.

Ciao.
topsy23(m): 6:39pm On Jan 06
fashrola:


Abeg which granite you buy? Cos when I started my foundation work, I bought 30 tons for almost 1 million Naira last year….

The price of granite depend on your location. Even in Lagos price vary. But 1million for 30ton is way too high anyway. Mainland should be around 380-410k for 20ton
bixton(m): 6:57pm On Jan 06
fashrola:


Abeg which granite you buy? Cos when I started my foundation work, I bought 30 tons for almost 1 million Naira last year….


When you say almost 1 million, like how much was it less to the million and also where was the building site located when you bought it and from where did your supplier told you he was getting the granite from?

I also want to ask if the 30 tons supplied to you came in what kind of truck/trailer....I mean to know how many tyres it got?
olukaygold(m): 7:31pm On Jan 06
Your 25m can give You this topnotch 3bedroom bungalow edifice. GV today.

1 Like

OkanlawonB(m): 7:33pm On Jan 06
fashrola:


Abeg which granite you buy? Cos when I started my foundation work, I bought 30 tons for almost 1 million Naira last year….

Your location is most likely far away from Southwest where there are quarries, l paid averagely 540k per 30tons multiple times for Lagos delivery.
fashrola(m): 7:53pm On Jan 06
topsy23:


The price of granite depend on your location. Even in Lagos price vary. But 1million for 30ton is way too high anyway. Mainland should be around 380-410k for 20ton

Akwa Ibom State

Most of the granite is sourced from Odukpani/Akampa
fashrola(m): 7:57pm On Jan 06
OkanlawonB:


Your location is most likely far away from Southwest where there are quarries, l paid averagely 540k per 30tons multiple times for Lagos delivery.

Yeah, my location is in Akwa Ibom and mostly all the granites, stones here are brought from Akampa/Odukpani (The transportation alone plus clearance, permit & levies etc makes it more expensive)
twinskenny(m): 8:24pm On Jan 06
ajabani4allah:


Thanks, can it be corrected with painting only?
No
Alliswell73: 8:26pm On Jan 06
Alliswell73:
Woodwork for roofing.

Experts in the house, help me check the following quotation from the carpenter:

1. 3by4—80pcs—#2,500 per one = #200,000
2. 2by4—200pcs—#1,400 = #280,000
3. 3by2 —650pcs—#1,100 =#715,000
4. 2by6—480pcs—#2,500 = #1,200,000
5. 2by2—180pcs—#1,000 = #180,000
6. Nail 4 inch—2bags—#28,000 = #56,000
7. Nail 3inch—3bags—#28,000 = #74,000
8. Nail 2½ inch—1bag—#28,000 = #28,000
9. Transportation — #50,000
10. Total = #2,783,000

The workmanship is not included yet.

Assist me to peruse the above quotation. The building is a 4-bedroom bungalow. The length is 43ft by 72ft according to him. Also, he said the height of the kingpost is 22ft.

Thanks.


Please, don't ignore it.🙏


UC92: 9:12pm On Jan 06
Sabibouy:
Hello house, pls help me check this quotation for a 4 bedroom bungalow German floor foundation I got from an engineer
If you have not commenced this project, I will advise you to call for a redesign of the floor plan.
It is not working biko.
topsy23(m): 9:33pm On Jan 06
fashrola:


Akwa Ibom State

Most of the granite is sourced from Odukpani/Akampa

Ooh okay
Skydivine: 10:46pm On Jan 06
fashrola:


Yeah, my location is in Akwa Ibom and mostly all the granites, stones here are brought from Akampa/Odukpani (The transportation alone plus clearance, permit & levies etc makes it more expensive)
Why would you choose to buy granite from Akamkpa to Akwa Ibom when Calabar Itu road is un able. The truck could spend a week on that road. A distance that normally is less than 1 hour 30 mins. Buying from Ebonyi should have been easier and cheaper. We bought for #700k the last time.
greenmoney001: 11:35pm On Jan 06
Hello Gurus in the house. I am about to do a dwarf fence for a 690 sqr meter land which is about 1 and a half plot. Location is in Umuahia, Abia state. I will like to know what the current cost of cement is at the moment and how many bag of cement and blocks will be okay to do a dwarf fence. Maybe 5 couches of block from ground level. I would need estimate. Your opinions are welcomed.
Thanks guys
fashrola(m): 3:39am On Jan 07
Skydivine:

Why would you choose to buy granite from Akamkpa to Akwa Ibom when Calabar Itu road is un able. The truck could spend a week on that road. A distance that normally is less than 1 hour 30 mins. Buying from Ebonyi should have been easier and cheaper. We bought for #700k the last time.

All granite used in Akwa Ibom state are brought from Akamkpa, there’s no quarry in Akwa Ibom.

So that’s the option available here….. Granite are gotten within 3-4 days based on booking
fashrola(m): 3:41am On Jan 07
Skydivine:

Why would you choose to buy granite from Akamkpa to Akwa Ibom when Calabar Itu road is un able. The truck could spend a week on that road. A distance that normally is less than 1 hour 30 mins. Buying from Ebonyi should have been easier and cheaper. We bought for #700k the last time.

All granite used in Akwa Ibom state are brought from Akamkpa, there’s no quarry in Akwa Ibom.

So that’s the option available here….. Granite are gotten within 3-4 days based on booking, some are available already on ground but if not you have to wait for the granite to come but definitely you will see granite in UYO but it will be a little more expensive than waiting for days for granite to come
Beframia: 6:12am On Jan 07
I'm not a building professional though but I sense that the building design is as a result of the shape/size of your land. However, you may ask your architect to still review the plan especially the portions I marked red (window protrusions and dinning wall) whether they are necessary.
Regarding your request, @ Saydfact use to be very helpful in this area but noticed he's been inactive on this forum for some while, I only hope all's well with him. Better still, get a BOQ from a professional.
I wish you speed in your project journey.


Sabibouy:
Hello house, pls help me check this quotation for a 4 bedroom bungalow German floor foundation I got from an engineer

1 Like

twinskenny(m): 6:30am On Jan 07
fashrola:


All granite used in Akwa Ibom state are brought from Akamkpa, there’s no quarry in Akwa Ibom.

So that’s the option available here….. Granite are gotten within 3-4 days based on booking


wow reason why its expensive
sommerfeltservi: 9:05am On Jan 07
For your building construction project, Bill of Quantity( *BOQ *or Quotation chat a professional on 08099212590 note BOQ attract a token charges for you to get the accurate Labour and Materials Cost of your Building project thanks in anticipation :Note Serious Customers only
saydfact(m): 9:51am On Jan 07
Beframia:

@ Saydfact, compliments of the season. It's been quite some while we felt your presence here. Hope you are doing great?
Kindly help this person making this request.


What better way to start 2025... thanks boss for checking up and for the trust in me...

I've been either busy or too lazy to open property section for months now.... grin grin grin

However, I've made myself available to the few people who ed me via whatsapp........ I appreciate.

I'll look at his request and see how I can be of help.
saydfact(m): 9:55am On Jan 07
Alliswell73:
Please, help me look in this quote for parapet precast or concrete fascia; whatever name it applies.

The builder quotes the following materials:

1. Rings triangle—7dozen, 4k per dozen = #28,000
2. 12mm TMT 20 length —#12k×20= #240,000
3. 10mm TMT 6 length — #8500 ×6= #51,000
4. 1/4 rod 18 length —#1600×18=#28,800
5. Sharp sand—#100,000
6. Granite— 15tonnes=#180,000
7. Cement 45bags—10,000×45=#450000
8. Bamboo 50 pcs—1000 per one= #50,000
9. Workmanship #380,000

Total= #1,507,800

Please, help me check the quote if they're not artificially inflated. Also, if the labour cost(workmanship fee) is moderate we can negotiate further.


Thanks.

I think this is not for PRECAST FACIAL (PARAPET) but rather IN-SITU CONCRETE FACIAL - Has the work been done?

kind regards
saydfact(m): 9:56am On Jan 07
Beframia:

I'm not a building professional though but I sense that the building design is as a result of the shape/size of your land. However, you may ask your architect to still review the plan especially the portions I marked red (window protrusions and dinning wall) whether they are necessary.
Regarding your request, @ Saydfact use to be very helpful in this area but noticed he's been inactive on this forum for some while, I only hope all's well with him. Better still, get a BOQ from a professional.
I wish you speed in your project journey.



THANKS BOSS
saydfact(m): 9:59am On Jan 07
Sabibouy:
Hello house, pls help me check this quotation for a 4 bedroom bungalow German floor foundation I got from an engineer

hi,
wHATS THE STAGE OF WORK? - have you started yet?
you can also reach me via my whatsapp nos - check my bio
saydfact(m): 9:59am On Jan 07
Sabibouy:
Hello house, pls help me check this quotation for a 4 bedroom bungalow German floor foundation I got from an engineer

hi,
wHATS THE STAGE OF WORK? - have you started yet?
you can also reach me via my whatsapp nos - check my bio (The drawing you attahed isn't clear enough i.e The dimensions are not showing)

GOODLUCK
horlabiyi(m): 10:56am On Jan 07
[quote author=Alliswell73 post=133607197][/quote]

First you need to know the size of your building. Dont just listen to what the carpenter/bricklayer say take a measuring tape and measure the building by yourself and the price of the wood by yourself. Ask the carpenter the type of wood he’s getting for you. Then come back here

1 Like

Alliswell73: 12:45pm On Jan 07
saydfact:


I think this is not for PRECAST FACIAL (PARAPET) but rather IN-SITU CONCRETE FACIAL - Has the work been done?

kind regards



Yes.
Alliswell73: 12:46pm On Jan 07
horlabiyi:


First you need to know the size of your building. Dont just listen to what the carpenter/bricklayer say take a measuring tape and measure the building by yourself and the price of the wood by yourself. Ask the carpenter the type of wood he’s getting for you. Then come back here


Thanks.

1 Like

Procarpenter: 1:18pm On Jan 07
Alliswell73:
Woodwork for roofing.

Experts in the house, help me check the following quotation from the carpenter:

1. 3by4—80pcs—#2,500 per one = #200,000

2. 2by4—200pcs—#1,400 = #280,000

3. 3by2 —650pcs—#1,100 =#715,000

4. 2by6—480pcs—#2,500 = #1,200,000

5. 2by2—180pcs—#1,000 = #180,000

6. Nail 4 inch—2bags—#28,000 = #56,000

7. Nail 3inch—3bags—#28,000 = #74,000

8. Nail 2½ inch—1bag—#28,000 = #28,000

9. Transportation — #50,000

10. Total = #2,783,000

The workmanship is not included yet.

Assist me to peruse the above quotation. The building is a 4-bedroom bungalow. The length is 43ft by 72ft according to him. Also, he said the height of the kingpost is 22ft.

Thanks.

Can I see the plan or the picture of the building and did it have parapet or not,and where’s the site located so I can give you the best quotation ever with warranty.

arcahmad(m): 1:34pm On Jan 07
Some key takeaways from block decking

- It reduces loads by replacing quite amount of concrete with blocks
- More stronger than normal R.C slabs and can span longer.
- Requires 50% iron, gravels, sand and cement compared to normal slab.
- Carpentry work, electrical and plumbing is same as normal slab.
- The method has been in existence for a long time

me to handle your work professionally

1 Like

rotecch77(m): 1:38pm On Jan 07
We continue from where we stopped last year.
Hidden flat roof done.
Watch out for more
It cost less than 3m to roof this building with 0.55mm gauge Long span Aluminium

1 Like

Alliswell73: 6:15pm On Jan 07
[quote author=Procarpenter post=133616110][/quote]

It has a parapet.

Reply)