NewStats: 3,261,254 , 8,173,530 topics. Date: Wednesday, 28 May 2025 at 05:02 PM 17634a

6z3e3g

Lagos - Calabar Highway - Politics - Nairaland 1n5w4b

Lagos - Calabar Highway (1424 Views)

(4)

(1) Go Down)

Sec5(m): 11:53am On Jun 17, 2024
For some weeks now, there's been no news about the Lagos Calabar highway. I want to ask, is work still going on or has it been abandoned?

2 Likes 1 Share

onez: 11:59am On Jun 17, 2024
You mean the criminal high way?

7 Likes

helinues: 12:04pm On Jun 17, 2024
Sebi your phone dey work? Visit the site and take pinshures

13 Likes 2 Shares

Sec5(m): 12:46pm On Jun 17, 2024
helinues:
Sebi your phone dey work? Visit the site and take pinshures



Abi?

The minister of works has gone mute. I hope all is well?

4 Likes

11Monkeys: 12:56pm On Jun 17, 2024
Which highway you dey look for? The criminal highway from Lagos to Calabar is only intended to terminate in Lagos state.

Anybody expecting any work to commence from the Calabar axis is a Foolish Fool.

A criminal is your president, don't expect a working system.

6 Likes 1 Share

Paraman: 1:12pm On Jun 17, 2024
Sec5:




Abi?

The minister of works has gone mute. I hope all is well?
Is anybody stopping you from going to the construction site to see things for yourself?

6 Likes 3 Shares

FourQu: 1:22pm On Jun 17, 2024
Their caterpillar have climbed mtn and airtel cable and hang 😆

3 Likes

Sec5(m): 1:24pm On Jun 17, 2024
Paraman:
Is anybody stopping you from going to the construction site to see things for yourself?


Nobody bro.

Can you now give us update about the project?

1 Like

christistruth01: 1:26pm On Jun 17, 2024
grin



Bad Belle cannot stop Lagos to Calabar Highway

12 Likes 1 Share

Kenochi(m): 1:32pm On Jun 17, 2024
Let me give you an update on the work and I want to tell you that you can go and all that I am telling you

As at today,the 17th June 2024,work is ongoing on four fronts on Lagos to Calabar Super Highway
The first part is the Victoria Island to Jakande Estate located on the Lekki Epe Expressway

The Second front is the Eleko inner junction (Around Amen Estate) back to Jakande Estate on Lekki Epe Expressway
The contractor is currently on site and they are Sandfilling and stabilizing the road
Properties have been marked for demolition along this axis in anticipation

The Third front is the Eleko inner junction to Folu Junction
Some part of the Road is been done by the Dangote and they are already working on delivering on the project

The fourth front is from Folu Town to Ogun State
Over the past few weeks,the Road Alignment was done by the Surveyors and last week the contractors mobilised to site
They have started clearing the Road paths, fortunately not much properties will be affected as most property owners gave set back for the road
I have videos and it seems I can't attach to this write up

Like I keep posting,it is not too late to get a pie e if the action,kindly click on my signature to learn more

7 Likes 2 Shares

Paraman: 2:07pm On Jun 17, 2024
Sec5:



Nobody bro.

Can you now give us update about the project?
construction is ongoing

1 Like

Paraman: 2:22pm On Jun 17, 2024
Sec5:



Nobody bro.

Can you now give us update about the project?
Sec5 construction is ongoing... Are you happy now?

1 Like

Okoroawusa: 2:26pm On Jun 17, 2024
11Monkeys:
Which highway you dey look for? The criminal highway from Lagos to Calabar is only intended to terminate in Lagos state.

Anybody expecting any work to commence from the Calabar axis is a Foolish Fool.

A criminal is your president, don't expect a working system.
Na so you talk for Second Niger Bridge until it was commissioned.

12 Likes 1 Share

11Monkeys: 2:49pm On Jun 17, 2024
Okoroawusa:

Na so you talk for Second Niger Bridge until it was commissioned.


This one no be second Niger bridge and I no talk anything about second Niger bridge. Stay on the topic make I no plank you to coma.

2 Likes

Slytiger: 3:48pm On Jun 17, 2024
Sec5:
For some weeks now, there's been no news about the Lagos Calabar highway. I want to ask, is work still going on or has it been abandoned?

There have been news. Maybe you should pay more attention.

2 Likes

Slytiger: 3:49pm On Jun 17, 2024
christistruth01:
grin



Bad Belle cannot stop Lagos to Calabar Highway
Watch him disappear after you posted this.

3 Likes

Sec5(m): 6:24pm On Jun 17, 2024
Paraman:
Sec5 construction is ongoing... Are you happy now?


Happy?
Just wanted to know how far with the project
Paraman: 6:31pm On Jun 17, 2024
Sec5:



Happy?
Just wanted to know how far with the project
Now you know. How far with the Aba-PH road construction in Abia state?
AcadaWriter: 2:21am On Jun 18, 2024
Bad Belle cannot stop Lagos to Calabar Highway
Sec5(m): 2:29pm On Jun 18, 2024
AcadaWriter:
Bad Belle cannot stop Lagos to Calabar Highway

So asking for update about the project is "bad belle".

You are pathetic and petty
Suunnn(f): 2:30pm On Jun 18, 2024
Sec5:
For some weeks now, there's been no news about the Lagos Calabar highway. I want to ask, is work still going on or has it been abandoned?

It Is Well Indeed
ShinnBet: 2:34pm On Jun 18, 2024
11Monkeys:
Which highway you dey look for? The criminal highway from Lagos to Calabar is only intended to terminate in Lagos state.

Anybody expecting any work to commence from the Calabar axis is a Foolish Fool.

A criminal is your president, don't expect a working system.


It's so pathetic reading your kind of comments here.


This project has only exposed your deep seethed hatred for the SS people .

Even Aboki no dey complain.

SS people are not complaining and have given their full to it.

So why in God's name is this project paining you people ?
ShinnBet: 2:37pm On Jun 18, 2024
Sec5:


So asking for update about the project is "bad belle".

You are pathetic and petty

You are the pathetic and petite individual here alongside your horde of ipob orcs.
Sec5(m): 2:44pm On Jun 18, 2024
ShinnBet:


You are the pathetic and petite individual here alongside your horde of ipob orcs.

Incoherent ranting as always.
Cabalgeneral: 2:46pm On Jun 18, 2024
Sec5:
For some weeks now, there's been no news about the Lagos Calabar highway. I want to ask, is work still going on or has it been abandoned?


Face your south east

1 Like

Sec5(m): 2:49pm On Jun 18, 2024
Cabalgeneral:


Face your south east

Face your life if you have one
DevilsEqual(m): 2:54pm On Jun 18, 2024
christistruth01:
grin



Bad Belle cannot stop Lagos to Calabar Highway

11Monkeys Heal sharply abeg


Kenochi:
Let me give you an update on the work and I want to tell you that you can go and all that I am telling you

As at today,the 17th June 2024,work is ongoing on four fronts on Lagos to Calabar Super Highway
The first part is the Victoria Island to Jakande Estate located on the Lekki Epe Expressway

The Second front is the Eleko inner junction (Around Amen Estate) back to Jakande Estate on Lekki Epe Expressway
The contractor is currently on site and they are Sandfilling and stabilizing the road
Properties have been marked for demolition along this axis in anticipation

The Third front is the Eleko inner junction to Folu Junction
Some part of the Road is been done by the Dangote and they are already working on delivering on the project

The fourth front is from Folu Town to Ogun State
Over the past few weeks,the Road Alignment was done by the Surveyors and last week the contractors mobilised to site
They have started clearing the Road paths, fortunately not much properties will be affected as most property owners gave set back for the road
I have videos and it seems I can't attach to this write up

Like I keep posting,it is not too late to get a pie e if the action,kindly click on my signature to learn more
Paraman: 3:04pm On Jun 18, 2024
Kenochi:


The fourth front is from Folu Town to Ogun State
Over the past few weeks,the Road Alignment was done by the Surveyors and last week the contractors mobilised to site
They have started clearing the Road paths, fortunately not much properties will be affected as most property owners gave set back for the road
The fourth front is where the section 2 will start and it was flagged off by Umahi yesterday. It starts from Folu town and will end at the Ogun border

CC Sec5

(1) Reply)

Have You ed To Vote?

(Go Up)

Sections: How To . 31
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or s on Nairaland.