NewStats: 3,262,950 , 8,178,620 topics. Date: Wednesday, 04 June 2025 at 08:04 AM 2d1v6h

6z3e3g

Lagos-Ibadan Expressway: Julius Berger Criticized Over Open Bridge ts - Travel (2) - Nairaland 6e5224

Lagos-Ibadan Expressway: Julius Berger Criticized Over Open Bridge ts (27283 Views)

(4)

Go Down)

miqos02(m): 1:34pm On Jul 15, 2022
ajayiopy:

YOU KNOW WHY FG FIND IT DIFFICULT TO CONTROL THESE CONTRSCTORS? EVERYONE DON COLLECT KICKBACK.
AM A VENDOR TO UNICEF,ONCE YOU ARE GIVEN A JOB. NO MOBILIZATION,YOU LOOK FOR YOUR FUND , BUILD TO THE SPECIFICATION GIVEN,WRITE YOUR INVOICE AND YOU GET PAID.
WITH THAT YOU WILL FOLLOW EVERYTHING TO THE LETTER.
still not an excuse to do shady job
onuman: 1:47pm On Jul 15, 2022
ogododo:



https://punchng.com/lagos-ibadan-motorists-slam-julius-berger-over-open-bridge-ts/



Nigeria's apex political leaders are selected from the group of most poorly educated people, so they couldn't trust Nigerians to do the job Julius Berger is doing.

3 Likes

Globad(f): 1:52pm On Jul 15, 2022
Julius Berger is very poor at managing traffic while handling the construction of that highway.

RCC is much better

1 Like

Bluntemperor: 1:58pm On Jul 15, 2022
Raysleek:
Julius berger has carried out a very bad job on the lagos ibadan expressway, not only on the long bridge. Its a shame

Too shameful, for they( Julius Berger) were not like this before but have swallowed up Nigeria virus of non-challant attitude, which they could not do in ,UK, USA and even China- without a backlash!
In China 1.3Billion Citizens,- you steal/ defraud/ corrupt the State,you are executed without delay but here in Nigeria,we are very big men- doing evil and rubbing it over the Masses!
Terrible!

1 Like

Bluntemperor: 2:00pm On Jul 15, 2022
Raysleek:
Julius berger has carried out a very bad job on the lagos ibadan expressway, not only on the long bridge. Its a shame

Too shameful, for they( Julius Berger) were not like this before but have swallowed up Nigeria virus of non-challant attitude, which they could not do in ,UK, USA and even China- without a backlash!
In China 1.3Billion Citizens,- you steal/ defraud/ corrupt the State,you are executed without delay but here in Nigeria,we are very big men- doing evil and rubbing it over the Masses!
Terrible!
How long is this Lagos -Ibadan Express Road going to stay before it becomes operational?

1 Like

rickleye: 2:08pm On Jul 15, 2022
Eriokanmi:
Julius berger is overrated. They do quack jobs most times.

What's a sign of a failed state?

This is when a country who had been existing for over 50 years with numerous universities which had graduated thousands of civil engineers but still relies on foreign contractors for ordinary road constructions.

We must get it right next year. Even Tinubu's constriction firms in Lagos do something worse. Anyone in doubt should drive the length and breadth of roads constructed by them here in Lagos....it's in your hands naija.


Julius Berger is not overated.. Not sure how old you are but JB have built amazing structures in the country for decades. What you have to question are the stiff bribes they have to pay back plus wasn't there any representative from the department of works available to inspect the job ?
rickleye: 2:10pm On Jul 15, 2022
ajayiopy:

YOU KNOW WHY FG FIND IT DIFFICULT TO CONTROL THESE CONTRSCTORS? EVERYONE DON COLLECT KICKBACK.
AM A VENDOR TO UNICEF,ONCE YOU ARE GIVEN A JOB. NO MOBILIZATION,YOU LOOK FOR YOUR FUND , BUILD TO THE SPECIFICATION GIVEN,WRITE YOUR INVOICE AND YOU GET PAID.
WITH THAT YOU WILL FOLLOW EVERYTHING TO THE LETTER.

Exactly and thanks for shouting !!! They have received kickbacks and built it as they the client ( Nigeria) requested.
rickleye: 2:13pm On Jul 15, 2022
quentin06:
No more Berger of the 90s.
This is true but also the kickbacks were not as stiff as they are now.
ajayiopy: 2:16pm On Jul 15, 2022
miqos02:
still not an excuse to do shady job
WHEN EVERYBODY DON COLLECT,DEY CAN DO ANYHOW NOW.
Eriokanmi: 2:43pm On Jul 15, 2022
rickleye:


Julius Berger is not overated.. Not sure how old you are but JB have built amazing structures in the country for decades. What you have to question are the stiff bribes they have to pay back plus wasn't there any representative from the department of works available to inspect the job ?
I wouldn't tell you hold old . But I was much conscious when 3rd mainland bridge was commissioned. JB of those days of amazing infrastructure you mentioned isn't same JB of today. They're not so strong as they used to be. I've seen roads constructed by them which was redone in less than 2 decades after it was constructed. Lagos-abeokuta Expressway is a good example, which They're now reconstructing with skukuk funds. That road was started by same JB in 2005 and finished in 2007 from abule egba down to sango-ota. They've compromised greatly. In the 80s, if they bidded for a contract and they were being offered less, they'd not do the job cos they wanted to maintain the quality standards.

Over the years, thousands of civil engineers produced by our unis were supposed to improve on JB's weaknesses? What were the indigenous companies doing? What of our civil engineers?

2 Likes

rickleye: 2:53pm On Jul 15, 2022
Eriokanmi:
I wouldn't tell you hold old . But I was much conscious when 3rd mainland bridge was commissioned. JB of those days of amazing infrastructure you mentioned isn't same JB of today. They're not so strong as they used to be. I've seen roads constructed by them which was redone in less than 2 decades after it was constructed. Lagos-abeokuta Expressway is a good example, which They're now reconstructing with skukuk funds. They've compromised greatly. In the 80s, if they bidded for a contracts and they were being offered less, they'd not do the job cos they wanted to maintain the quality standards.

Over the years, thousands of cicil engineers produced by our unis were supposed to improve on JB's weaknesses? What were the indigenous companies where doing? What of our civil engineers?

Apologies, did not mean to make it personal with the age. Yes you are correct JB of the 90's isn't the same of now but is it because they employed local indigenes to take over or the engineers they recruited from are worth their stuff. I think you have hit the nail on the head. They have shifted their mindset and are cutting corners in order to afford the kickbacks they have to make. So they either have good uncompleted jobs or they complete the jobs with shoddy work.
They may be complacent but someone signed off that the job was completed to satisfaction from public and works or whatever local parastatal is in charge.
MMWandali: 3:00pm On Jul 15, 2022
And a certain useless government paid for it

It's not their fault
Prophet777: 3:00pm On Jul 15, 2022
The supervisor in charge of the Lagos-Sagamu section of the expressway, Wale Adebote, said he was not aware of the damaged bridge.

Negligence of the highest order... Imagine the kind of responses coming from the so called good for nothing project supervisor in charge?

1 Like

clothingonline(m): 4:33pm On Jul 15, 2022
Road maintanace is the solution
luluosas(m): 5:11pm On Jul 15, 2022
I think the expansion ts were poorly designed and executed. It should be corrected by the contractor please, before a serious problem emanate from there.
Cheers to you all
Wwwq: 8:01pm On Jul 15, 2022
Good
Ternistacle(m): 3:02am On Jul 16, 2022
Leave the bridge like that ... It was used in shooting the Xmen 2006
Dfynboi: 6:59am On Jul 16, 2022
9ja na cruise
Originalsly: 7:52am On Jul 16, 2022
Maxymilliano:


With never-ending constructions and rehabilitations on that road, which has turned to nightmares and waste of manhours to motorists and commuters, this is inexcusable, coming from Julius Berger.


The Federal Controller said he will send contractors. What can we learn from this? JB may have been the contractor for constructing the bridge only... and incompetent local contractors responsible for maintenance. Since when does water wash away tar? No doubt... JB knows what it takes to smoothly cover the ts but the contractor don't. I'm almost sure NB is not responsible for maintenance.
Cognitivereason: 4:08pm On Jul 16, 2022
miqos02:
that nonsense company, even Chinese companies are better than them. They love the traffic hold ups the create. Nonsense

no dey yarn nonsense..
no chinese company ..even CCECC doesnt beat julius berger..
miqos02(m): 4:23pm On Jul 16, 2022
Cognitivereason:


no dey yarn nonsense..
no chinese company ..even CCECC doesnt beat julius berger..
oga, have you ed the other stretch handled by the Chinese company ? There are no complaints about that. Only Julius Berger own has issues. Before you respond, note that I through this road daily. So I will show you proof of you need.
Cognitivereason: 4:25pm On Jul 16, 2022
miqos02:
oga, have you ed the other stretch handled by the Chinese company ? There are no complaints about that. Only Julius Berger own has issues. Before you respond, note that I through this road daily. So I will show you proof of you need.

lol...am not sure you know what you are saying...there is no chinese contractor building anything on lagos ibadan expressway..
no dey yarn nonsense
miqos02(m): 4:30pm On Jul 16, 2022
Cognitivereason:


lol...am not sure you know what you are saying...there is no chinese contractor building anything on lagos ibadan expressway..
no dey yarn nonsense
I made a mistake, the other company is RCC
zanshi: 12:14am On Jul 17, 2022
I noticed it on Lagos Ibadan expressway when i ed around Berger
Raysleek: 2:12pm On Jul 17, 2022
Bluntemperor:


Too shameful, for they( Julius Berger) were not like this before but have swallowed up Nigeria virus of non-challant attitude, which they could not do in ,UK, USA and even China- without a backlash!
In China 1.3Billion Citizens,- you steal/ defraud/ corrupt the State,you are executed without delay but here in Nigeria,we are very big men- doing evil and rubbing it over the Masses!
Terrible!
How long is this Lagos -Ibadan Express Road going to stay before it becomes operational?
The thing tire me my brother, I'm perplexed. They saw this article and have starting hurriedly patching the ts on Longbridge. Even the sections they have finished constructing on the laogs ibadan express, more than one lane is covered with mud sand because they refused to construct the sections under all the bridges. U turns are very far from each other. Under the bridges in prayer city/magboro, Arepo and even warewa were not taken into consideration. Those sections are a mess

Reply)

10 Stunning Natural Swimming Spots In Nigeria

(Go Up)

Sections: How To . 37
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or s on Nairaland.