Installation of electric fence-wire powered by solar successfully installed. Date: 31/07/2024 Address: Aba Pan, kola Ibadan. Client: Mr. Ola Work duration: 1day
|
![]() |
Installation of electric fence-wire powered by solar successfully installed. Date: 31/07/2024 Address: Aba Pan, kola Ibadan. Client: Mr. Ola Work duration: 1day
|
![]() |
Where we are...graming of the gates
Abolarin91:
|
![]() |
Where we are...framing of gates.
Abolarin91:
|
![]() |
So far so good...we are moving.
Abolarin91:
|
![]() |
So far so good! ![]() Abolarin91:
|
![]() |
Materials delivered to site and installation has commenced ![]() •Anti-fingermesh •sliding gates. •razor Barb-wire(on the block wall) Abolarin91:
|
![]() |
Materials delivered to site and installation has commenced ![]() •Anti-fingermesh •sliding gates. •razor Barb-wire(on the block wall) Abolarin91:
|
![]() |
Inventory time for proposed anti-finger mesh... Date: 19/07/2024 Address: Nike art gallery Road, ikate lekki. Client: Mrs. Elima
|
![]() |
Inventory time for proposed anti-finger mesh... Date: 19/07/2024 Address: Nike art gallery Road, ikate lekki. Client: Mrs. Elima
|
![]() |
Materials well delivered, installation to be done after casting of the poles. Date: 13/07/2024 Address: Ogbomoso Client: Mr. Oguntola Joseph Material: electric fence-wire materials.
|
![]() |
Materials well delivered, installation to be done after casting of the poles. Date: 13/07/2024 Address: Ogbomoso Client: Mr. Oguntola Joseph Material: electric fence-wire materials.
|
![]() |
Your integrity and competency will speak for you ![]() Abolarin91:
|
![]() |
Just satisfy your client and you will be satisfied too ![]() ![]() Abolarin91:
|
![]() |
Thanks for the patronage ![]() ![]() Abolarin91:
|
![]() |
Thanks for the patronage... ![]() Abolarin91:
|
![]() |
Razor Barb-wire fully installed... Date: 9/07/2024 Address: oparun estate, Redemption camp. Client: Mr. John Adaras; Cc: Mrs. Adaras Work duration: 1day
|
![]() |
Razor Barb-wire fully installed... Date: 9/07/2024 Address: oparun estate, Redemption camp. Client: Mr. John Adaras; Cc: Mrs. Adaras Work duration: 1day
|
![]() |
I always reject the calls
|
![]() |
Materials taken to the park for delivery... Date: 8/07/2024 Address: Osogbo, osun state. Materials: Dampalon(polycarbonate) Client: Armstrong paint; Cc: Mr. Hammed Ayodeji
|
![]() |
Materials taken to the park for delivery... Date: 8/07/2024 Address: Osogbo, osun state. Materials: Dampalon(polycarbonate) Client: Armstrong paint; Cc: Mr. Hammed Ayodeji
|
![]() |
Whatever we promised we fulfill...we don't joke with our promise. ![]() Abolarin91:
|
![]() |
Whatever we promised we fulfill...we don't joke with our promise. ![]() Abolarin91:
|
![]() |
Work done and dusted...
Abolarin91:
|
![]() |
Done and dusted... ![]() Abolarin91:
|
![]() |
Materials delivered and installation has commenced... Date: 4/07/2024 Address: 221 Herbert Macaulay Way Yaba Client: mrs. Ezinne Azuaru Material: finger mesh(black) Work duration: 1day
|
![]() |
Materials delivered and installation has commenced... Date: 4/07/2024 Address: 221 Herbert Macaulay Way Yaba Client: mrs. Ezinne Azuaru Material: finger mesh(black) Work duration: 1day
|
![]() |
Another razor Barb-wire(lapping of new wire on old wire) installation carried out by Bolbaz home tech ![]() Date: 25/06/2024 Address: 102 Oba Akran avenue, Ikeja,Lagos. Client: Berger paint plc. Work duration: 1day
|
![]() |
Another razor Barb-wire(lapping of new wire on old wire) installation carried out by Bolbaz home tech ![]() Date: 25/06/2024 Address: 102 Oba Akran avenue, Ikeja,Lagos. Client: Berger paint plc. Work duration: 1day
|
![]() |
Eletric fence-wire successfuly installed... Date: 25/06/2024 Address: pagun, Ibadan. Client: Architect Lanre Work duration: 2days
|
![]() |
Eletric fence-wire successfuly installed... Date: 25/06/2024 Address: pagun, Ibadan. Client: Architect Lanre Work duration: 2days
|
![]() |
Some days after inspection, installation finally commence... Date of inspection: 11/06/2024 Date of installation: 24/06/2024 Address: Lekki phase1, Lagos Client: Architect Afolabi Materials: finger mesh(black) Work duration: 1-2days
|