zero8zero(m): 9:32am On Feb 20
The Honourable Minister of Works, Sen. (Engr.) David Nweze Umahi, has emphasized that the adoption of Continuous Reinforcement Concrete Pavement (CR) technology on roads in flood-prone areas, particularly those with high water tables and heavy traffic, is a significant step forward for Nigeria.

Senator Umahi made this statement while inspecting the ongoing reconstruction of a 2.46-kilometre Special Intervention Project on the East-West Road in Delta State (CH.28+400-CH.50+300) on Tuesday, 18th February 2024. The project is being handled by M/S Truetech Global Investment Services Limited.

The Minister praised the technology’s benefits, noting that

"roads built with concrete will last between 50 to 100 years, while asphalt roads typically last only about 10 years".

He highlighted that concrete is ideal for flood-prone roads, emphasizing its durability and suitability for areas with high rainfall and traffic volumes.

“It’s the best thing for Nigeria, especially in regions with high water tables,” Umahi remarked, reiterating President Bola Ahmed Tinubu’s commitment to prioritizing roads along the nation’s economic corridors.

“The permanent solution for east-west road is to use concrete and raise it above the flood plains,” he stressed.

He explained that his ministry opted for concrete to raise the pavement around the flood plains identified on the road between Delta and Ahoada area of Rivers State.

He assured that when completed, the concrete would last between 50 and 100 years, unlike the asphalted portions of the road with a life span of 10 years or even less.

“Concrete is very friendly with rainfall. The asphalt will always fail when the underground water touches the bottom of the asphalt.

This concrete will last fifty and hundred years. Asphalt hardly last within ten years. “The first section is here( around the Umeh market ). And it’s about 2.5 kilometer.

The second section 3 kilometers spread out .” This is a road constructed within the flood lane. The flood of last year dealt terribly with it and the road was cut into two.

President Bola Tinubu directed that we should immediately remedy it.

“We have looked at the east-west road and we found that the water table is very high. There are a lot of flood plains on the road, so what we are doing is to isolate the locations the roads were constructed within the flood plains. And raise the road pavement with concrete.

“The contractor at Umeh has completed a section almost a kilometer. He is doing the relief cover so the water can escape from one point to the other. He has completed a section and will start work on the second section.

‘’We are doing the same thing towards Ahoada and Bayelsa. Before May 2025, it will be completed and we will come and commission the two sections. The contractor assured us,’’ the minister

During the inspection, the Minister interacted with youth and community leaders in the project areas. They expressed satisfaction with the quality of work and requested that more projects be extended to their communities.

Motorists and commuters also praised the ongoing work, noting the improvements made to previously dilapidated roads, which are now providing better value for taxpayers’ money.

Other ongoing projects inspected by the Minister include:

110.63 km Dualisation of Sapele – Agbor – Ewu Road (Section I: Sapele – Agbor), being handled by Messrs CGC (Nig) Ltd.

83.3 km Rehabilitation of Asaba-Agbor Dual Carriageway, Edo State Border, managed by Messrs Hartland (Nig) Ltd.

23.2 km Reconstruction of Benin-Sapele-Warri Dual Carriageway, Section III (Ibada Elume – Warri), under the Road Infrastructure Development and Refurbishment Investment Tax Credit Scheme, contracted to M/S Skecc (Nig.) Ltd.

Engr. Umahi urged the contractors to expedite their work, stressing that President Tinubu is eager to see the projects completed, as he is determined to alleviate the hardships faced by Nigerians due to poor road conditions.

The Minister also called for cooperation and understanding as the government continues its efforts to improve Nigeria’s road infrastructure.

https://www.vanguardngr.com/2025/02/roads-why-were-championing-concrete-technology-umahi/

8 Likes 1 Share

zero8zero(m): 9:33am On Feb 20
A performing minister.

24 Likes

Barbsloon(m): 9:34am On Feb 20
Mr. Concrete

14 Likes

Kenneth4u205(m): 9:38am On Feb 20
Foolish man . Nigeria concrete is different from abroad concrete. Your dangote cement will only last 1 year

20 Likes 4 Shares

EmperorCaesar(m): 9:38am On Feb 20
cheesy

Umahi is one workaholic

By the time they are done in 2031, we will have bigger highways connecting major cities, aiding logistics, which in turn ease economical and commercial activities within Nigeria, thereby laying an excellent economic foundation of a greater Nigeria for whoever is coming in


We didnt vote amiss.
We got it right this time

20 Likes 2 Shares

YeyeGbami: 9:40am On Feb 20
Kenneth4u205:
Foolish man . Nigeria concrete is different from abroad concrete. Your dangote cement will only last 1 year

Yen yen, Lagos apapa oshodi rd don 1 year.

44 Likes 1 Share

Freetech: 9:55am On Feb 20
Another positive and great development

...... But located in the zone iof ngrates who are only happy when there's bad news agbotikuyo

See them mannerless children from SadEast of hatred
Bobloco:


We actually voted incorrectly and got it all wrong in every way.


lexy2014:


what is the result of what he has worked so far that shows he is a workaholic?

is this the result of your getting it right this time?


https://www.youtube.com/watch?v=zYltMapDyIo&t=3s

They will end up vandalizing the road infrastructure and turn it to burial ground like the 2nd Niger bridge Buhari gave them

39 Likes 2 Shares

axglide(m): 9:55am On Feb 20
the Lord thy God in the days of thy youth.

4 Likes

mbahdi(m): 9:56am On Feb 20
Umahi na ode
killuminati(m): 9:57am On Feb 20
Is he preggy? grin
ifytrik(m): 9:57am On Feb 20
axglide:
the Lord thy God in the days of thy youth.
success1smyn(m): 9:57am On Feb 20
YeyeGbami:


Yen yen, Lagos apapa oshodi rd don 1 year.

Thanks for this, no be everybody dey go out

14 Likes

abc115: 9:59am On Feb 20
God Bless Dr Umahi
God Bless President Bola Tinubu
God Bless Federal Republic of Nigeria

39 Likes

aieromon(m): 10:00am On Feb 20
Kenneth4u205:
Foolish man . Nigeria concrete is different from abroad concrete. Your dangote cement will only last 1 year

You lie Sir.

13 Likes

AbujaLagos: 10:02am On Feb 20
Kenneth4u205:
Foolish man . Nigeria concrete is different from abroad concrete. Your dangote cement will only last 1 year
bitterd

11 Likes

sofeo(m): 10:04am On Feb 20
Alright
Richie6(m): 10:05am On Feb 20
YeyeGbami:


Yen yen, Lagos apapa oshodi rd don 1 year.

Come and inspect the Ajah Epe expressway, you will see crack already on the road...

1 Like

YeyeGbami: 10:07am On Feb 20
Richie6:


Come and inspect the Ajah Epe expressway, you will see crack already on the road...


Hope say no be you and your fellow aboki condemn dey try loot the iron inside. grin. #JK

maintenance would be carried out on any crack.

29 Likes

Cleanmouth: 10:08am On Feb 20
"roads built with concrete will last between 50 to 100 years, while asphalt roads typically last only about 10 years".

You are right Mr Umahi.

The concrete road MotherCat Construction company did in Warri between Enerhen Junction and NPA old port in 1980 is still standing strong till today without pot hole despite abuse from tankers and trailers plying it daily.

The only difference is that Dangote Cement is inferior compare to the type of cement they used then. The cement were imported from Norway.

12 Likes 2 Shares

WhizdomXX(m): 10:09am On Feb 20
Great
Bobloco: 10:09am On Feb 20
EmperorCaesar:
cheesy

Umahi is one workaholic

By the time they are done in 2031, we will have bigger highways connecting major cities, aiding logistics, which in turn ease economical and commercial activities within Nigeria, thereby laying an excellent economic foundation of a greater Nigeria for whoever is coming in


We didnt vote amiss.
We got it right this time

We actually voted incorrectly and got it all wrong in every way.
santaclaws: 10:10am On Feb 20
Kenneth4u205:
Foolish man . Nigeria concrete is different from abroad concrete. Your dangote cement will only last 1 year

You go school at all? 😒

7 Likes

jedisco(m): 10:11am On Feb 20
Kenneth4u205:
Foolish man . Nigeria concrete is different from abroad concrete. Your dangote cement will only last 1 year


So what is the difference?

Hope you realise that concrete has been in use for hundreds of years right?

4 Likes

datola: 10:11am On Feb 20
zero8zero:
A performing minister.

Wey Sabi him work well well
lexy2014: 10:13am On Feb 20
zero8zero:
A performing minister.

what has he performed?
Paraman: 10:15am On Feb 20
The same road Jonathan couldn't construct just a mere 1km in 6 years?

1 Like

lexy2014: 10:16am On Feb 20
EmperorCaesar:
cheesy

Umahi is one workaholic

By the time they are done in 2031, we will have bigger highways connecting major cities, aiding logistics, which in turn ease economical and commercial activities within Nigeria, thereby laying an excellent economic foundation of a greater Nigeria for whoever is coming in


We didnt vote amiss.
We got it right this time

what is the result of what he has worked so far that shows he is a workaholic?

is this the result of your getting it right this time?


https://www.youtube.com/watch?v=zYltMapDyIo&t=3s
zero8zero(m): 10:18am On Feb 20
Bobloco:


We actually voted incorrectly and got it all wrong in every way.


You & who?, who are the we?. Better talk for yourself.

3 Likes

lexy2014: 10:18am On Feb 20
Paraman:
The same road Jonathan couldn't construct just a mere 1km in 6 years?

which buhari built in 8years

1 Like

(1) Reply)