NewStats: 3,263,743 , 8,181,216 topics. Date: Saturday, 07 June 2025 at 04:28 PM 332v2j6z3e3g |
Proper Analysis Of Design And Cost Of A Foundation Design For Bungalows (83476 Views)
abdulwastecx(m): 8:21pm On May 23, 2015 |
sule4: Always better to do it before super structure ( wall ontop of the foundation) because it help to create a uniform level after the foundation in other to receive the super structure block wall, with a properly spread membrane ( polystyrene) it help prevent moisture from rising through the block wall which may spoil painting and plastering in the super structural wal 2 Likes |
jfkenny(m): 9:09pm On May 23, 2015 |
Can one use pieces of blocks and concrete from a demolished house to fill the foundation..instead of latterite
|
abdulwastecx(m): 9:24pm On May 23, 2015 |
jfkenny: yes sir, provided it is properly compacted |
Btruth: 9:28pm On May 23, 2015 |
Booking a seat already. ![]() |
scylla27(m): 9:29pm On May 23, 2015 |
abdulwastecx: Brilliant. But u forgot a very important aspect. Site survey. Nature of soil. It determines the type of foundation to be required. |
Re: Proper Analysis Of Design And Cost Of A Foundation Design For Bungalows by Nobody: 9:32pm On May 23, 2015 |
abdulwastecx, pls i need an advice on foundation and decking costing... in portharcourt, a storey building measuring 20,000mm by 10,000mm. like how much by rough estimate should the foundation and decking cost? thank you, abdulwastexc |
emmadejust(m): 9:33pm On May 23, 2015 |
[size=30pt] following and learning ..... [/size] |
Icon4s(m): 9:35pm On May 23, 2015 |
abdulwastecx: Thanks for this response. U are a gift to humanity. God bless u. 6 Likes |
abeffiom(m): 9:37pm On May 23, 2015 |
Firstly speaking as a qualified QUANTITY SURVEYOR dpc is very different from overs site concrete. Pls let that be noted first. DPC means damp proof course which is asingle shit of water proof running alone the wall. We also have Dpm. Which is damp proof membrain which is put in b/w the floor and held by the wire mesh. Pls dpc ain't oversite concrete. Pls.
17 Likes 2 Shares |
laclass(m): 9:42pm On May 23, 2015 |
I like it ,will lov to hav ur
|
darepoju(m): 9:51pm On May 23, 2015 |
abdulwastecx:good job... que.. do u actually need d BRC for a bungalow floor slab..? |
Saryea83: 9:52pm On May 23, 2015 |
abdulwastecx:Interesting and informative! |
darepoju(m): 9:54pm On May 23, 2015 |
abeffiom:..lolzz.. yes..u are very right sir.... a lot of ppl get confuse and mix every thing up.... Only professionals get it right. .. 3 Likes |
gmacnoms(m): 9:55pm On May 23, 2015 |
So, lyk hw much is d total cost of layin d foundation
|
Re: Proper Analysis Of Design And Cost Of A Foundation Design For Bungalows by Nobody: 9:56pm On May 23, 2015 |
@OP ... Good work . However, I, for one, I don't take engineering theory serious. Out there in the field, before you will finish this epistle, an informally educated mason ( brick layer) cum contractor would give you a structurally sound, standing and lasting building. I doff my hat for the informally educated brick layers cum contractors in the building sector. This is my experience and opinion, therefore I don't owe anyone an apology . 12 Likes 1 Share |
luckman20(m): 9:59pm On May 23, 2015 |
Weldone bro
|
Oluwatosin555(m): 10:01pm On May 23, 2015 |
Pls sir can you do me a favour, can you pls send this whole package to my e-mail really need to understand this rudiment before embarking on my own project, pls sir to [email protected]...... Thanks
|
MrLittleFinger1(m): 10:05pm On May 23, 2015 |
abdulwastecx: Nice job. But your interpretation of the mix ratios seems confusing, or at best, incorrect. Please, revisit. ![]() |
conine: 10:13pm On May 23, 2015 |
I really appreciate this analysis, thanks
|
400billionman: 10:22pm On May 23, 2015 |
I don't know why I dont like reading again ? Put this lecture inside DVD and see me watching it.. 2 Likes |
afortress(m): 10:23pm On May 23, 2015 |
just in time... doing my fence monday.... i so appreciate this...
|
Shos19(m): 10:32pm On May 23, 2015 |
Dis is real educative and gud at dis point for pple like us who have been nursing d †ђξ ambition of starting smtin small like dis. Pls I wld like if I can get d break down in ma mail. [email protected]
1 Like |
vitality22(m): 10:42pm On May 23, 2015 |
I love this
|
abdulwastecx(m): 10:45pm On May 23, 2015 |
MrLittleFinger1: My friend i don't see anything ambiguous my explanation above. when i say 1:2:4 means one bag of cement to four head pan of sharp sand and eight head pan of gravel/granite, i am saying that by assuming that a bag of cement is equivalent to two head pan of cement ( which is practically accurate ) 3 Likes 1 Share |
Cost Of Fence On 1 Plot Of Land
(Go Up)
Sections: How To . 31 Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or s on Nairaland. |